API 1169 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about API 1169? On this page you'll find 95 study documents about API 1169.

All 95 results

Sort by

API 1169 Study Test Questions Test RM#1 | Questions with 100% Correct Answers | Latest Version 2024 | Verified
  • API 1169 Study Test Questions Test RM#1 | Questions with 100% Correct Answers | Latest Version 2024 | Verified

  • Exam (elaborations) • 14 pages • 2024
  • According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. - Equal According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. - 4.5 This legislation covers hazardous substance, site contamination, and cleanup - Comprehensive environmental recovery, compensation, and liability act. A blueprint showing the exact route of a pipeline ...
    (0)
  • $12.49
  • + learn more
API 1169 Exam Questions and Answers 100% Correct
  • API 1169 Exam Questions and Answers 100% Correct

  • Exam (elaborations) • 22 pages • 2024
  • API 1169 Exam Questions and Answers 100% Correct Which of the following equipment may NOT be required for a pressure test? - Answer- internal line clamps before testing begins, a ________ with explanatory notes and data should be prepared - Answer- pressure test procedure the pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelinesshould be performed in accordance with - Answer- ASME B31.4, 49 Code of Federal Regulations, Part 195 and any other ap...
    (0)
  • $12.49
  • + learn more
API 1169 Sample Test 100% Solved 2024
  • API 1169 Sample Test 100% Solved 2024

  • Exam (elaborations) • 7 pages • 2024
  • API 1169 Sample Test 100% Solved 2024 Which of the following equipment may NOT be required for a pressure test? - Answer- Internal line up clamps Before testing begins, a _____________ with explanatory notes and data should be prepared. - Answer- Pressure test procedure The pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelines should be performed in accordance with: - Answer- ASME, Code of Federal Regulations and any other applicable government...
    (0)
  • $11.49
  • + learn more
API 1169. Study test questions test RM#2 with 100% Correct Answers
  • API 1169. Study test questions test RM#2 with 100% Correct Answers

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • API 1169. Study test questions test RM#2 with 100% Correct Answers According to OSHA a "protective system" is defined as: - Answer- Method of protecting employees from cave-ins. Design and development inputs shall be identified and reviewed for? - Answer- Accuracy, completeness and lack of conflict The Excavator calls the One Call Center prior to excavation at least - Answer- Two working days nor more than ten working days Encroachment Area is the area where the ground disturbance occu...
    (0)
  • $12.49
  • + learn more
API 1169 Study test questions test RM#3 with 100% Correct Answers
  • API 1169 Study test questions test RM#3 with 100% Correct Answers

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • API 1169 Study test questions test RM#3 with 100% Correct Answers One main category variable of pressure test planning that an operator must consider is the _________________. - Answer- purpose Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the company. - Answer- True Location of casings cathode protection external anodes, and utility crossings should all be recorded on the. - Answer- as-built drawings Releasing air or water pressure through valves, a...
    (0)
  • $12.49
  • + learn more
API 1169 Exam Questions and Answers 100% Correct
  • API 1169 Exam Questions and Answers 100% Correct

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • API 1169 Exam Questions and Answers 100% Correct FERC - Answer- Federal Energy Regulatory Commission OSHA - Answer- Occupational Safety and Hazard Administration PHMSA - Answer- Pipeline Hazardous Materials and Safety Administration INGAA - Answer- Interstate Natural Gas Association of America CFR - Answer- Code of Federal Regulations EPA - Answer- Environmental Protection Act CERCLA - Answer- Comprehensive Environmental Response, Compensation and Liability Act also known as Superfund C...
    (0)
  • $11.49
  • + learn more
API 1169 INGAA Defs Exam Questions and Answers 100% Correct
  • API 1169 INGAA Defs Exam Questions and Answers 100% Correct

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • API 1169 INGAA Defs Exam Questions and Answers 100% Correct Active Excavation Area - Answer- is the area where the edge of the disturbance is within 25 feet of the centerline of existing facilities. Crossing Agreement - Answer- is the agreement entered into between the Owner of the existing facility and Crossing Company installing the new facility to specify the rights and obligations of the parties during the Crossing Construction. Crossing Angle - Answer- is the angle measured between t...
    (0)
  • $10.49
  • + learn more
API 1169 A Grade Exam with Questions & Answers| Passed
  • API 1169 A Grade Exam with Questions & Answers| Passed

  • Exam (elaborations) • 15 pages • 2024
  • Which of the following equipment may NOT be required for a pressure test? - internal line clamps before testing begins, a ________ with explanatory notes and data should be prepared - pressure test procedure the pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelinesshould be performed in accordance with - ASME B31.4, 49 Code of Federal Regulations, Part 195 and any other applicable governmental regulations.
    (0)
  • $12.89
  • + learn more
API 1169 Study test questions test RM#3 Questions & Answers| Passed
  • API 1169 Study test questions test RM#3 Questions & Answers| Passed

  • Exam (elaborations) • 15 pages • 2024
  • One main category variable of pressure test planning that an operator must consider is the _________________. - purpose Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the company. - True Location of casings cathode protection external anodes, and utility crossings should all be recorded on the. - as-built drawings
    (0)
  • $12.89
  • + learn more